Page 11 - BEC / DEC / 2021
        P. 11
     With the original G.E. Booth WWTP being built in
        the 1950s, Glass explains that it has been expanded
        or modified around 75 different times in its life.
        “There’s always been active construction—it’s never
        not been in a construction condition,” he says.
        “What changes is - how intense that construction
        actually is. This does make the site a little bit
        more complicated just because you have all those
        different historical designs on one site, as well
        as being within the boundaries of two distinct
        conservation offices.”
        “The goal is to have diversification, or not one
        singular system, especially at the Clarkson WWTP
        where it uses a digestion system—converting
        biosolids through the removal of viruses and
        pathogens so it allows us to reuse the biosolids as
                                                                               DEC 2021  |  BUSINESS ELITE CANADA     11
     	
