Page 7 - Chinook Power Station
P. 7

With over 500 people required at peak construction,
        SaskPower estimates that up to $140 million was                 Major infrastructures like

        generated to local businesses. This came in the                   Chinook Power Station

        way of services to the plant, like fencing or security
                                                                        will reduce the province’s
        services and doesn’t include spending of workers
                                                                     dependence on coal and lower
        on services like hotels, restaurants and other
                                                                       greenhouse gas emissions.
        retail. Longer term, the power station permanently
        employs about 25 people.

                                                                while reducing our overall emissions footprint.
        TECHNOLOGY


                                                                The highly efficient combined-cycle operation will

        The combined-cycle facility features a Siemens          use exhaust heat that would otherwise be lost in a
        F-Class gas turbine, a heat recovery steam              simple-cycle configuration. The hot exhaust from

        generator (HRSG) and a Siemens steam turbine to         the initial cycle is captured to boil water into steam

        boost power output and maximize energy efficiency       in the HRSG and spin an additional second