Page 43 - BEC / MAY / 2022
P. 43

Water Treatment Plants electrical system will also      together in a way that allows for flexibility and gives

        be upgraded and were designed to allow the Water        the operators the ability to address a variety of

        Treatment Plant’s electrical and process systems        situations.
        to become fully redundant. This will improve

        reliability, increase ease of maintenance, and reduce   “The key component to this project is the addition of
        complexity of future expansions.”                       two new 2 Mega watt diesel generators that will be

                                                                integrated with the two existing 2 mega watt diesel

        The design allows for the system to make the whole      generators to provide a robust and reliable source
        of the Water Treatment Plant more reliable, create      for back-up power in the event of a power outage.

        opportunities for more effective maintenance with       This will significantly enhance the operational

        increased safety, and increase the efficiency of        reliability of the plant to achieve the City’s goal of
        the pump system. Delivering safe drinking water         providing a continuous source of drinking water to

        requires the systems and equipment to be put            the citizens of Saskatoon and surrounding area.



                                                                              MAY 2022  |  BUSINESS ELITE CANADA     43
   38   39   40   41   42   43   44   45   46   47   48