Page 5 - Stanley Mission Water Treatment Plant
P. 5

in disinfection by-products and was not meeting         systems are estimated to be adequate until 2028.”
        existing drinking water quality guidelines. The new

        and improved process will bring the treated water       When asked what will the project delivery in

        quality within the existing guidelines.                 terms of additional treatment equipment, Hergott
        “This project will allow for additional treatment       explains that a Trident package filtration system

        equipment to be installed to ensure the delivery        (one refurbished existing unit and a new unit), and

        of clean drinking water to the community,” Project      reverse osmosis membrane system, ultraviolent
        Manager from Associated Engineering, Bob Hergott.       and chlorine disinfection are included in the project

        “With upgrades to the emergency power, motor            delivery.
        control, advanced state of the art processes and

        automation, this facility will supply the needs of the   “A generator is installed in the WTP to provide

        community for years to come.”                           backup power for distribution pumping system to
                                                                provide continuous water supply to community

        The project consists of an expanded water               during the power outage,” he says.
        treatment plant which includes an updated and new

        process to improve treated water quality. There is      The expanded WTP has an electrical room to house

        also a new raw water pumphouse, new raw water           all 600V motor starter and variable frequency
        intake, and discharge line.                             drives. A programmable logic controller is used

                                                                to control and monitor the operation of the

        “The expanded and improved water treatment has          water supply and treatment system, and online
        a design with a 10-year horizon,” says Hergott. “The    instruments are installed at each step of treatment

        expanded and improved water treatment and supply        process to monitor the overall plant performance.



 4                                                                                                                     5
   1   2   3   4   5   6