Historic City Hall September 1912.



        That’s when Bell was tasked with managing               to a weeping tile to drain the water away from the
        the building’s rehabilitation. However, the most        building, into the stormwater system and out onto

        important measures Bell took to protect the building    the main street.
        for future generations remained mostly hidden from

        view.                                                   “That did not exist before,” Bell says. “The water

                                                                used to just run off the roof, into the gutters and
        REHABILITATION OF HISTORIC                              overflow into the building. Some parts of the roof

        CITY HALL BEGINS                                        had no gutters, which was one of the major causes


                                                                of deterioration of the original sandstone.”
        The project team began Historic City Hall’s

        rehabilitation by installing a rain-water management    Another of the first steps was to build scaffolding

        system to protect the sandstone and the building        and a heavy-duty protective enclosure that housed
        for generations to come. Bell and the team then         the building. This allowed the crew to work year-

        connected the rain-water management system              round regardless of weather conditions which