Toronto Hydro

Reliability for the Core: Why Toronto Hydro is Building a New Transformer Station in the City’s Downtown Core By: Toronto Hydro Between 2006 and 2011, the population in the city’s downtown increased by over 50 per cent. Based on Toronto Hydro’s load forecast, between 2017 and 2022 anticipated load increases will exceed the ability [...]