BEC / APR / 2026

In a region where congestion has long been the cost of growth, the opening of the stal̕əw̓asəm (Riverview) Bridge signals a meaningful shift in how goods, people, and investment move across the Fraser River. Connecting New Westminster and Surrey, the highly-anticipated project replaces the nearly 90-year-old Pattullo Bridge with infrastructure built for safety, reliability, and long-term economic performance. “The stal̕əw̓asəm Bridge is a four-lane, toll-free bridge that improves travel for drivers, cyclists and pedestrians, as well as communities on either side of the bridge,” says Navjeet Tiwana, Executive 25 APR 2026 | BUSINESS ELITE CANADA

RkJQdWJsaXNoZXIy MTE4MTQ=